A detailed project showcase of SPEED INT'L's break bulk operations for high-density steel coils and industrial pipes. Featuring expert dunnage, precise underdeck stowage, and secure ocean transit to Africa.
Loading Ports: Shanghai/Tianjin/Qingdao/Taicang Destination: Lagos, Tema, Luanda, Mombasa, Dar es Salaam Schedule: Monthly
Steel coils and pipes are heavy, dense and sensitive to moisture. SPEED INT’L uses eye-to-side stowage, proper dunnage and ventilation for damage-free transit.

In a recent shipment, SPEED INT’L moved 1,200 tons of hot-rolled steel coils for a steel trading client. The job included eye-to-side stowage with moisture protection - and every coil arrived rust-free and damage-free.
Project data: Tema, Ghana | 1,200 tons of hot-rolled steel coils | SPEED INT’L NVOCC (MOC-NV11880)
SPEED INT’L ships steel coils and pipes from China to Africa with specialized stowage, lashing and moisture protection - zero damage record.
| ✓ Coils & Pipes Specialists | ✓ Engineered Stowage Plans |
| ✓ Moisture Protection | ✓ Class-Approved Lashing |
| ✓ 17 Years of Africa Logistics | ✓ Zero Damage Record |
| ✓ 200,000+ RT Annual Volume | ✓ End-to-End Project Handling |
Q: What is the minimum order for steel break bulk?
A: We handle steel shipments from 20 tons up to 5,000 tons.
Q: How are coils protected during transit?
A: Eye-to-side stowage, proper dunnage, and ventilation for moisture control.
Q: Can you ship steel to inland destinations?
A: Yes - we coordinate road or rail transport from the African port to inland sites.
Q: What is the typical transit time?
A: Approximately 25-45 days from South China ports to major African destinations.